Tectonic has been appointed to serve on an annual basis as the Village of Warwick’s consultant for dam safety compliance. As such, Tectonic is responsible for performing safety inspections and engineering assessments and preparing updates to Emergency Action Plans and annual certifications for the Village’s three water supply reservoir dams.
Over the course of fifteen years, Tectonic has provided design phase geotechnical, civil, environmental, structural, and surveying services for the Village’s Upper, Middle and Lower Warwick Reservoir Dams. Engineering services provided include:
Alternatives Analysis for Improvements to three reservoir dams
Engineering Assessment for Upper and Lower Reservoir Dams
Dam Breach Analyses for Upper and Middle Reservoir Dams
Design of repair of leaking water supply main beneath the Lower Reservoir Dam embankment
Design of repairs to the Upper Reservoir Dam and Spillway damaged by Hurricane Irene
Design and permitting for rehabilitation of the Lower Reservoir Dam and Spillway and reservoir dredging
Design and permitting for dredging of the Lower and Middle Reservoirs
Preparation of Inspection & Maintenance Plans for all three dams
Preparation of Emergency Action Plan for the Lower Reservoir Dam
Performance of Safety Inspections for all three dams
Inspection of the construction for the Lower Reservoir Dam rehabilitation and reservoir dredging projects