USMA Foley Athletic Center

Tectonic has a long history of performing work at various sites throughout the United States Military Academy. Tectonic provided multi-discipline support including civil and geotechnical engineering, surveying, and construction inspection services for the design and construction phases at the Foley Athletic Center, a 77,000-square foot facility designed by Baker Barrios Architects. The Center was constructed to provide Army athletic teams with a climate-controlled indoor practice facility.

Services included:

  • Performing a value engineering redesign of the project’s stormwater management facility to address impacts of shallow rock, groundwater influence, and construction budget.
  • Providing State Pollutant Discharge Elimination System (SPDES) Compliance inspections (under NYSDEC General Permit) to assist with the Contractor’s management of erosion and sediment control associated with the project’s development.
  • Performing a ground survey based on the North American Vertical Datum of 1988 (NAVD 1988) with mapping prepared in AutoCAD format showing all visible improvements, subsurface utility information, and topography to facilitate design of the new facility.
  • During construction, setting survey control lines for the installation of steel frame and prefabricated panels for the new building, drainage, and sanitary sewer structures.

The completed facility has become the largest donation in the history of the Academy. It houses a regulation 100-yard football field with a FieldTurf® playing surface utilized by several of Army’s teams including football, baseball, softball, soccer, and lacrosse.

Become a prequalified vendor

Become a prequalified vendor

INSTRUCTIONS

Companies interested in providing professional services or construction services to Tectonic must be prequalified. Firms that provide products or other services are not required to be prequalified.

  • Thank you for your interest in doing business with Tectonic:
  • Please answer all questions and provide all requested information. If a question is not applicable, indicate as “N/A” and provide an explanation if necessary.
  • Supplemental information sheets should be used to provide additional information that does not fit on the form.
  • Clearly indicate at the top of the supplemental information sheet which section of the questionnaire it references.
  • After the questionnaire is fully reviewed for completeness, please click on the “Submit” button.
  • Any questions regarding this form can be sent to prequal@tectonicengineering.com.

GENERAL

Maximum file size: 33.55MB

PRIMARY (CORPORATE) OFFICE INFORMATION

(Use this format: mm-dd-yyyy)

PRIMARY CONTACT

SECONDARY CONTACT

OFFICERS

.

STOCKHOLDERS

(include only those owning 5% of more of stock. Attach a supplemental sheet if needed.)

COLLECTIVE BARGAINING AGREEMENTS

(Identify union affiliations)

SERVICE CAPABILITIES

.

SERVICES PROVIDED

(Select all services that apply)

Maximum file size: 5MB

STAFFING

.

OFFICE LOCATIONS & REGIONS SERVED

(Including primary office)

LITIGATION / CONTRACT DISPUTES

List any judments, arbitrations, liens, insurance claims, or lawsuits the firm has been subject to within the past 5 years. If there are none, respond by saying there were none.

Maximum file size: 5MB

CRIMINAL BACKGROUND INFORMATION

Has the firm, any affiliate, or any of the current or former principal owners, stockholders, or officers or managerial employees:

Insurance Coverage

State your standard coverage limits in COLUMN 2 below.

POLICY

Occurrence (or claim) limit

Aggregate limit

GCL

Auto

Umbrella / Excess

Pollution / Liability

Workers Compensation

Professional Liability

Health & Safety

Maximum file size: 33.55MB

Health & Safety (Cont.)

If Yes, does the training include:

Health & Safety (Cont.)

Health & Safety (Cont.)

Provide the following information for the last 3 years. You must respond to all questions even if your firm is not required to maintain OSHA logs.
  YEAR (most recent 3 years)

  Current Year

  Prior Year

  Prior Year

Worker's Compensation
Experience Modification Rate (EMR)
Number of Fatalities
(list any, explain in Supplemental Information field at the end of this form.)
Lost Work Day Incident Rate
(total lost-time recordable cases x 200,000 / total hours worked.)
OSHA Recordable Incident Rate
(total OSHA recordable cases x 200,000 / total hours worked)
Total Number of Hours Worked
(per occurrence)
The following upload fields allow for uploading of multiple files.

  1. To upload multiple files please click-and-hold the CTRL key and left-click with your mouse.
  2. Once you have selected the file(s) hit the "Open" button on the the dialog box.

Maximum file size: 10MB

Maximum file size: 10MB

Maximum file size: 10MB

Quality Assurance (QA) / Quality Control (QC) Practices

PERFORMANCE

Similar Contracts - List 3 contracts (within the last 5 years) for which your firm is providing services similar to those your firm is seeking to be prequalified for.
Client Type
Fee

PRIOR CONTRACT WITH TECTONIC

If you have previously performed services for Tectonic, list up to 3 projects and the scope of work performed.

PROJECT PERFORMANCE REFERENCES

List a minimum of 3 references for services performed within the last 3 years. REFERENCES MUST BE KNOWLEDGEABLE OF AND ABLE TO COMMENT ON YOUR FIRM’S ADHERENCE TO PROJECT BUDGETS AND SCHEDULES.

PERFORMANCE ISSUES

Has firm at any time failed to complete a contract or had a contract terminated?

LITIGATION / CONTRACT DISPUTES has the firm been subject to any of the following within the past 5 years?

Judgements
Liens
Insurance Claims
Lawsuits
If Yes to any of the above, have any rulings, outcomes, or judgements been made against the firm as a result?
(If "Yes", provide more information for each on a supplemental sheet.)

SUPPLEMENTAL INFORMATION

Required upload size: 10MB - 33.55MB

CERTIFICATION

The undersigned certifies, under penalty of law, that the information provided and the representations are accurate and current. Making false representations or providing inaccurate information may result with being disqualified as a prequalified consultant or in termination of a contract.
Please note
When you save the information as draft your attachments will also be saved.

FOR TECTONIC USE ONLY

Sending
Sending
Sending

Special Inspection Feedback Form

Special Inspection Feedback Form

Section

1 = Not reliable and 10 = Very reliable
1 = Not well and 10 = Extremely well
1 = Not Satisfied and 10 = Extremely Satisfied
1 = Not satisfied and 10 = Very satisfied

Section

1 = Not Satisfied and 10 = Very Satisfied
1 = Not Satisfied and 10 = Very Satisfied
1 = Not Satisfied and 10 = Very Satisfied
1 = Not Satisfied and 10 = Very Satisfied

Section

(Please fill only if you answered "Yes" in the previous question)
Sending

Service Evaluation

Service Evaluation

Section

Your name
The company you're working with
A contact phone number if you would like to be contacted (In this format XXX-XXX-XXXX)
Feel free to express your views of TECTONIC service.
Sending

Enter your search criteria below: