The eastern portion of the Town adjacent to Sindall Brook was experiencing flooding and property damage during significant rainfall events. Suspecting incremental effects of continued development of the upper reaches of the watershed, the Municipality retained Tectonic to review the stormwater management design approved for a project located in the watershed, but under the jurisdiction of an adjacent municipality. Tectonic performed a detailed study of the one square mile watershed including: field reconnaissance, homeowner meetings and outreach, hydrologic analysis and modeling using HEC-HMS, and hydraulic modeling (using HEC-RAS, HEC-HMS, manufacturers proprietary channel design software, or FHWA HY-8, depending on the location being analyzed) of six locations where mitigation of the stream banks was warranted to address erosive conditions. Final design phase services included preparation of plans, details, and specifications for the implementation of the stabilization by the Municipality.
Select a Prequalification form...
The information helps Tectonic evaluate a vendor’s service capabilities, the volume of work the vendor can readily handle, insurance coverages, as well as health and safety information.
Prequalified vendors will have their purchase orders expedited and will be recommended for future work that falls within that firm’s service capabilities.