Tectonic provided geotechnical engineering and site surveying services for this new 48,000 SF addition to a 1980’s, 89,000 SF, multi-story hospital and medical care clinic.
Geotechnical analysis was performed in accordance with U.S. Department of Defense Unified Facilities Criteria as well as site-specific Fort Drum Installation Design Guide documents for structural design. Tectonic performed a subsurface investigation including borings and test pits and prepared a geotechnical engineering report detailing the methods of investigation.
The $28 million addition supported an increase in the number of patients from about 36,000 to 43,000 soldiers, family members and retirees.
Select a Prequalification form...
The information helps Tectonic evaluate a vendor’s service capabilities, the volume of work the vendor can readily handle, insurance coverages, as well as health and safety information.
Prequalified vendors will have their purchase orders expedited and will be recommended for future work that falls within that firm’s service capabilities.