Tectonic provided geotechnical engineering and site surveying services for this new 48,000 SF addition to a 1980’s, 89,000 SF, multi-story hospital and medical care clinic.
Geotechnical analysis was performed in accordance with U.S. Department of Defense Unified Facilities Criteria as well as site-specific Fort Drum Installation Design Guide documents for structural design. Tectonic performed a subsurface investigation including borings and test pits and prepared a geotechnical engineering report detailing the methods of investigation.
The $28 million addition supported an increase in the number of patients from about 36,000 to 43,000 soldiers, family members and retirees.