Tectonic performed the Security Vulnerability Assessment and Security Master Planning (SMP) for the DC Water and Wastewater System including Washington, DC and areas of Virginia. This effort included developing a threat assessment, risk analysis and master security plan to establish the Design Basis Threats for a comprehensive Security Assessment of the District’s Water and Wastewater System including the Blue Plains Treatment Facility. Tectonic balanced the overall systems operational issues, with the desire to secure critical assets.

gallery