Construction Management of John F. Kennedy International Airport Redevelopment Program

Tectonic is part of a joint venture team including STV Incorporated, & LiRo Engineers (SLT JV) is providing construction management services for the Port Authority of New York and New Jersey on the $13 billion redevelopment program at John F. Kennedy International Airport (JFK) in Queens.

The main responsibilities of the team are overseeing and managing on-going JFK Redevelopment construction work on a continuous full-time basis. The team support the Port Authority’s Senior Management with a broad range of duties to manage the cost, schedule and quality of the airport redevelopment including resident engineering, contract administration, planning and scheduling, coordination, cost control, technical inspections and materials testing.

The program consists of significant reconfiguration, transformation and expansion of JFK facilities to meet the standards of the 21st century and increase its capacity to serve the community of users at large.  The master plan includes:

  • Modernization of major terminals
  • Construction of new international terminal
  • Construction of new jet Blue terminal
  • New parking garages and substations
  • Construction of elevated roadways and improvements for transportation access
  • Utility infrastructure improvements
  • Airfield modifications including new taxiways
  • Demolition of buildings
  • Extensive management of traffic during construction

JFK International Airport is an indispensable international gateway for global travel into North America and is recognized as the sixth busiest airport within the United States.  The airport services nearly 62 million passengers a year, generates over $51 billion in sales and supports 280,000 jobs. JFK currently has six independently operating terminals with 128 boarding gates overall, four runways and over 30 miles of roadways traversing its 4,930 acres.  Each terminal has its own Departure and Arrival Halls and all are accessible by New York City’s extensive transportation system, including the AirTrain and shuttle buses.

The new master plan expands and modernizes the airport to create one unified terminal layout.  The new JFK provides:

  • Redesigned on-airport traffic pattern
  • Centralized ground transportation options
  • Expanded taxiways and gate capacity
  • State of the art security
  • First-rate amenities

The redevelopment is progressing in stages and in an environmentally responsible manner.

Become a prequalified vendor

Become a prequalified vendor

INSTRUCTIONS

Companies interested in providing professional services or construction services to Tectonic must be prequalified. Firms that provide products or other services are not required to be prequalified.

  • Thank you for your interest in doing business with Tectonic:
  • Please answer all questions and provide all requested information. If a question is not applicable, indicate as “N/A” and provide an explanation if necessary.
  • Supplemental information sheets should be used to provide additional information that does not fit on the form.
  • Clearly indicate at the top of the supplemental information sheet which section of the questionnaire it references.
  • After the questionnaire is fully reviewed for completeness, please click on the “Submit” button.
  • Any questions regarding this form can be sent to prequal@tectonicengineering.com.

GENERAL

Maximum file size: 33.55MB

Upload a copy of your certificate(s) and/or screenshot(s) verifying the above reported status. * If you do not have any verifications, please be sure to check the box above for None or Not Applicable*

PRIMARY (CORPORATE) OFFICE INFORMATION

(Use this format: mm-dd-yyyy)

PRIMARY CONTACT

SECONDARY CONTACT

CLAIMS CONTACT

OFFICERS

.

STOCKHOLDERS

(include only those owning 5% of more of stock. Attach a supplemental sheet if needed.)

COLLECTIVE BARGAINING AGREEMENTS

(Identify union affiliations)
Do you have experience with projects that require Certified Payroll and Davis Bacon Wage Rates?

SERVICE CAPABILITIES

.

SERVICES PROVIDED

(Select all services that apply)

Maximum file size: 5MB

STAFFING

.

OFFICE LOCATIONS & REGIONS SERVED

(Including primary office)


LITIGATION / CONTRACT DISPUTES

List any judments, arbitrations, liens, insurance claims, or lawsuits the firm has been subject to within the past 5 years. If there are none, respond by saying there were none.

Maximum file size: 5MB

CRIMINAL BACKGROUND INFORMATION

Has the firm, any affiliate, or any of the current or former principal owners, stockholders, or officers or managerial employees:

Insurance Coverage

State your standard coverage limits in COLUMN 2 below.

POLICY

Occurrence (or claim) limit

Aggregate limit

GCL

Auto

Umbrella / Excess

Pollution / Liability

Workers Compensation

Professional Liability

Cyber / Network Security Liability


Health & Safety

Maximum file size: 33.55MB

Health & Safety (Cont.)

If Yes, does the training include:

Health & Safety (Cont.)

Health & Safety (Cont.)

Provide the following information for the last 3 years. You must respond to all questions even if your firm is not required to maintain OSHA logs.

  YEAR (most recent 3 years)

  Current Year

  Prior Year

  Prior Year

Worker's Compensation
Experience Modification Rate (EMR)


Number of Fatalities
(list any, explain in Supplemental Information field at the end of this form.)


Lost Work Day Incident Rate
(total lost-time recordable cases x 200,000 / total hours worked.)


OSHA Recordable Incident Rate
(total OSHA recordable cases x 200,000 / total hours worked)


Total Number of Hours Worked
(per occurrence)


The following upload fields allow for uploading of multiple files.
  1. To upload multiple files please click-and-hold the CTRL key and left-click with your mouse.
  2. Once you have selected the file(s) hit the "Open" button on the the dialog box.

Maximum file size: 10MB

Sending

Special Inspection Feedback Form

Special Inspection Feedback Form

Section

1 = Not reliable and 10 = Very reliable
1 = Not well and 10 = Extremely well
1 = Not Satisfied and 10 = Extremely Satisfied
1 = Not satisfied and 10 = Very satisfied

Section

1 = Not Satisfied and 10 = Very Satisfied
1 = Not Satisfied and 10 = Very Satisfied
1 = Not Satisfied and 10 = Very Satisfied
1 = Not Satisfied and 10 = Very Satisfied

Section

(Please fill only if you answered "Yes" in the previous question)
Sending

Service Evaluation

Service Evaluation

Section

Your name
The company you're working with
A contact phone number if you would like to be contacted (In this format XXX-XXX-XXXX)
Feel free to express your views of TECTONIC service.
Sending

Enter your search criteria below: