MTA / LIRR Project Management Consultant (PMC) Services for Hall Interlocking Expansion

Tectonic is providing multi-disciplinary Project Management Consultant (PMC) services to assist in administering and overseeing the Hall Interlocking Expansion Design-Build (DB) Project for MTA Construction & Development’s Long Island Rail Road (LIRR) Business Unit through its Construction and Closeout Phases.

This project, part of the larger Jamaica Capacity Improvement (JCI) Phase II program, includes the design and construction of a new two-track rail-bridge and associated infrastructure in the middle of existing LIRR Hall Interlocking (just east of Jamaica Station.) This additional work includes construction of new retaining walls, state of good repair to existing bridge and tunnel structures, widening of an existing rail bridge, installation of new track / switches / power infrastructure, installation of two new cantilevered signal equipment platforms, and other utility work.

General responsibilities include:

  • Construction Oversight / Compliance
  • Design Oversight / Compliance
  • Environmental Compliance
  • Special Testing and Material Inspection
  • Quality Assurance
  • Safety Oversight
  • Cost & Schedule Management
  • Risk Assessment
  • Project Administration

New 150th Street / Track E2 & E3 Rail Bridge:

This new closed-deck double-track rail bridge will allow two (2) new track routes to access the center of Jamaica Station from the east, which will result in additional parallel routing capabilities and an increase in overall interlocking and station throughput capacity. In future stages of JCI Phase II, these connections will allow for streamlined routing into / out of the station for all three main branches that run through Jamaica (i.e., Montauk, Main Line, and Atlantic), eliminating many existing routing conflicts that are present with the current operation of the interlocking / station. The western approach to the bridge will utilize the area currently serving as E Yard (Tracks E2 and E3), and the eastern approach to the bridge will utilize a current greenfield area between existing East and West Layup Tracks.  The bridge will span over LIRR’s Atlantic Track #1 and NYCDOT’s 150th Street.

Atlantic Track #1 & #2 Retaining Walls:

As part of reconstructing the former E-Yard area to serve as the western approach to the new 150th St Bridge, existing retaining walls flanking the right-of-way in this area will be replaced with a prefabricated modular wall.  This new wall will be of higher elevation than the existing wall to account for the necessary raising of E-Yard’s grade to match the minimum height of the new 150th Street rail bridge. Replacement of these walls will require extensive support of excavation to protect Atlantic Tracks #1 & #2 and will also require select outages of those tracks.

Rail Bridge Infills at Guy R. Brewer Blvd.:

As part of the future realignment of Hall Interlocking in later stages of JCI Phase II (to connect the two new through tracks being built over the new 150th St Bridge), the full width of LIRR’s right-of-way at this critical juncture will need to be utilized for new positioning and alignment of Main Line and Montauk Branch through tracks. This location currently does not permit any track realignments to the north or south due to the spatial restrictions imposed by the Guy R. Brewer Blvd. bridge, which is comprised of three separate parallel bridge deck structures with deck gaps present between each of the bridge decks. As such, this project will construct new structural bridge infills between the three existing bridge decks in staged weekend outage periods.

Become a prequalified vendor

Become a prequalified vendor

INSTRUCTIONS

Companies interested in providing professional services or construction services to Tectonic must be prequalified. Firms that provide products or other services are not required to be prequalified.

  • Thank you for your interest in doing business with Tectonic:
  • Please answer all questions and provide all requested information. If a question is not applicable, indicate as “N/A” and provide an explanation if necessary.
  • Supplemental information sheets should be used to provide additional information that does not fit on the form.
  • Clearly indicate at the top of the supplemental information sheet which section of the questionnaire it references.
  • After the questionnaire is fully reviewed for completeness, please click on the “Submit” button.
  • Any questions regarding this form can be sent to prequal@tectonicengineering.com.

GENERAL

Maximum file size: 33.55MB

Upload a copy of your certificate(s) and/or screenshot(s) verifying the above reported status. * If you do not have any verifications, please be sure to check the box above for None or Not Applicable*

PRIMARY (CORPORATE) OFFICE INFORMATION

(Use this format: mm-dd-yyyy)

PRIMARY CONTACT

SECONDARY CONTACT

CLAIMS CONTACT

OFFICERS

.

STOCKHOLDERS

(include only those owning 5% of more of stock. Attach a supplemental sheet if needed.)

COLLECTIVE BARGAINING AGREEMENTS

(Identify union affiliations)
Do you have experience with projects that require Certified Payroll and Davis Bacon Wage Rates?

SERVICE CAPABILITIES

.

SERVICES PROVIDED

(Select all services that apply)

Maximum file size: 5MB

STAFFING

.

OFFICE LOCATIONS & REGIONS SERVED

(Including primary office)


LITIGATION / CONTRACT DISPUTES

List any judments, arbitrations, liens, insurance claims, or lawsuits the firm has been subject to within the past 5 years. If there are none, respond by saying there were none.

Maximum file size: 5MB

CRIMINAL BACKGROUND INFORMATION

Has the firm, any affiliate, or any of the current or former principal owners, stockholders, or officers or managerial employees:

Insurance Coverage

State your standard coverage limits in COLUMN 2 below.

POLICY

Occurrence (or claim) limit

Aggregate limit

GCL

Auto

Umbrella / Excess

Pollution / Liability

Workers Compensation

Professional Liability

Cyber / Network Security Liability


Health & Safety

Maximum file size: 33.55MB

Health & Safety (Cont.)

If Yes, does the training include:

Health & Safety (Cont.)

Health & Safety (Cont.)

Provide the following information for the last 3 years. You must respond to all questions even if your firm is not required to maintain OSHA logs.

  YEAR (most recent 3 years)

  Current Year

  Prior Year

  Prior Year

Worker's Compensation
Experience Modification Rate (EMR)


Number of Fatalities
(list any, explain in Supplemental Information field at the end of this form.)


Lost Work Day Incident Rate
(total lost-time recordable cases x 200,000 / total hours worked.)


OSHA Recordable Incident Rate
(total OSHA recordable cases x 200,000 / total hours worked)


Total Number of Hours Worked
(per occurrence)


The following upload fields allow for uploading of multiple files.
  1. To upload multiple files please click-and-hold the CTRL key and left-click with your mouse.
  2. Once you have selected the file(s) hit the "Open" button on the the dialog box.

Maximum file size: 10MB

Sending

Special Inspection Feedback Form

Special Inspection Feedback Form

Section

1 = Not reliable and 10 = Very reliable
1 = Not well and 10 = Extremely well
1 = Not Satisfied and 10 = Extremely Satisfied
1 = Not satisfied and 10 = Very satisfied

Section

1 = Not Satisfied and 10 = Very Satisfied
1 = Not Satisfied and 10 = Very Satisfied
1 = Not Satisfied and 10 = Very Satisfied
1 = Not Satisfied and 10 = Very Satisfied

Section

(Please fill only if you answered "Yes" in the previous question)
Sending

Service Evaluation

Service Evaluation

Section

Your name
The company you're working with
A contact phone number if you would like to be contacted (In this format XXX-XXX-XXXX)
Feel free to express your views of TECTONIC service.
Sending

Enter your search criteria below: