Good Samaritan Hospital Emergency Department Expansion
Perkins + Will
Suffern, NY
12,000,000
The project included an expansion to the existing single-story, 11,500 sq. ft. Emergency Department at Good Samaritan Hospital. The addition included additional space for increased exam room capacity from 20 to 32 with the same number of Trauma rooms, larger exam rooms (increased to today’s standard), a new covered drop-off and entry vestibule, new waiting area, and a new covered drive-through ambulance receiving area to promote efficient patient delivery to the Emergency Department.
Tectonic provided geophysical location of private underground utilities, site planning and design, stormwater management, utility design, landscaping design, site lighting, local Village/Planning Board approvals, bid and construction support, and SPDES-compliance inspections during construction. Expedited survey and local approvals for a generator and patient canopy for the Medical Office Building were added during construction.
Located (electromagnetic and ground-penetrating radar methods), relocated, accommodated, and upgraded water, fire suppression, gas, steam, oxygen, electric, sanitary, and stormwater situated between the central power plant and Emergency Department.
Select a Prequalification form...
The information helps Tectonic evaluate a vendor’s service capabilities, the volume of work the vendor can readily handle, insurance coverages, as well as health and safety information.
Prequalified vendors will have their purchase orders expedited and will be recommended for future work that falls within that firm’s service capabilities.