World Trade Center Site Survey Crews

Tectonic has provided, and is currently providing, engineering, surveying, and construction phase services to the Port Authority of NY & NY (PANYNJ) for the rebuilding of the World Trade Center site, a 16-acre complex comprised of buildings presently undergoing construction.

Tectonic currently has two field crews working full time on site for several locations including the PATH station, Vehicular Security Center, One World Trade Center, and 4 World Trade Center. Services include maintaining survey control for use by other contractors throughout the site, checking the location and elevation of key structural components, providing as-builts of features and monitoring movement and settlement of adjacent structures. Tectonic’s crews are working on an active construction site, with multiple projects going on at the same time, and are able to coordinate their work with multiple crews and companies on a daily basis to ensure an accurate quality product is produced.

The site features six new skyscrapers, the National September 11 Memorial & Museum, transportation hub, PATH station, Vehicular Security Center, Liberty Park, and a Greek Orthodox Church.

Special Inspection Feedback Form

Special Inspection Feedback Form

Section

1 = Not reliable and 10 = Very reliable
1 = Not well and 10 = Extremely well
1 = Not Satisfied and 10 = Extremely Satisfied
1 = Not satisfied and 10 = Very satisfied

Section

1 = Not Satisfied and 10 = Very Satisfied
1 = Not Satisfied and 10 = Very Satisfied
1 = Not Satisfied and 10 = Very Satisfied
1 = Not Satisfied and 10 = Very Satisfied

Section

(Please fill only if you answered "Yes" in the previous question)
Sending

Service Evaluation

Service Evaluation

Section

Your name
The company you're working with
A contact phone number if you would like to be contacted (In this format XXX-XXX-XXXX)
Feel free to express your views of TECTONIC service.
Sending

Enter your search criteria below: