Verizon Wireless MSC Switch Facilities

Tectonic performed the programmatic building design for new Switching Facilities for Verizon Wireless. Tectonic took all projects from the design board through successful zoning approval, issuance of Construction Documents and into construction. For several facilities, Tectonic took the lead as overall Project Management of building system designs and construction management. Tectonic led its design team through value engineered systems of innovative and cost-effective options to provide Verizon Wireless with smarter, more energy-efficient buildings.

Tectonic additionally revised the initial preliminary floor plans to be more function-related and better suited to the needs of day-to-day operations. Building elevations were developed and renderings produced to illustrate the proposed buildings for purposes of jurisdictional approvals.

Special Inspection Feedback Form

Special Inspection Feedback Form

Section

1 = Not reliable and 10 = Very reliable
1 = Not well and 10 = Extremely well
1 = Not Satisfied and 10 = Extremely Satisfied
1 = Not satisfied and 10 = Very satisfied

Section

1 = Not Satisfied and 10 = Very Satisfied
1 = Not Satisfied and 10 = Very Satisfied
1 = Not Satisfied and 10 = Very Satisfied
1 = Not Satisfied and 10 = Very Satisfied

Section

(Please fill only if you answered "Yes" in the previous question)
Sending

Service Evaluation

Service Evaluation

Section

Your name
The company you're working with
A contact phone number if you would like to be contacted (In this format XXX-XXX-XXXX)
Feel free to express your views of TECTONIC service.
Sending

Enter your search criteria below: