Transmission Line Survey

Tectonic worked with Burns & McDonnell to provide surveying services on Jersey Central Power & Light’s 230-KV transmission line route that runs approximately 10 miles long, beginning at the NJ Transit Red Bank Substation and ending at the NJ Transit Aberdeen Substation. Tectonic performed a survey for the entire width of the NJ Transit Authority right-of-way. Additional services included:

  • Researching the public right-of-way along the transmission line route and incorporated proposed changes due to on-going local construction projects.
  • Surveying and planimetric mapping services
  • Location of all features within the Transit Authority’s right-of-ways
  • Layout of new power poles and the location of utilities and other potential interferences near the proposed power lines
  • Control for aerial mapping and ground truthing for aerial LiDAR

Tectonic’s survey crew performed these services along this active commuter rail line and adhered to all train schedules while working near the tracks under the direction of railroad safety personnel.

Special Inspection Feedback Form

Special Inspection Feedback Form

Section

1 = Not reliable and 10 = Very reliable
1 = Not well and 10 = Extremely well
1 = Not Satisfied and 10 = Extremely Satisfied
1 = Not satisfied and 10 = Very satisfied

Section

1 = Not Satisfied and 10 = Very Satisfied
1 = Not Satisfied and 10 = Very Satisfied
1 = Not Satisfied and 10 = Very Satisfied
1 = Not Satisfied and 10 = Very Satisfied

Section

(Please fill only if you answered "Yes" in the previous question)
Sending

Service Evaluation

Service Evaluation

Section

Your name
The company you're working with
A contact phone number if you would like to be contacted (In this format XXX-XXX-XXXX)
Feel free to express your views of TECTONIC service.
Sending

Enter your search criteria below: