Reconstruction and Realignment of U.S. Route 9

Tectonic provided construction inspection for a $73 million complex reconstruction of a 1.3 kilometers of major artery on U.S. Route 9 in Peekskill. Main element of work included major realignment of the existing roadway, the replacement of three Route 9 bridges (composite girders) over Requa Street, over Hudson Avenue and over Central Avenue; the replacement of Route 6 Bridge (composite girder) over Route 9; and the abatement, demolition and disposal of three buildings in the City of Peekskill.

In addition to the standard construction inspection services, Tectonic also provided services involving code compliance for NYSDOT maintenance facilities.

Responsibilities included resident engineering, contract administration, detailed technical inspections, on-site field testing of materials, field measurement and collection of data for final payments process, contractors partial and final payment estimates, coordination of contractor’s scheduling, processing RFI’s, preparation of daily IR’s and preparation of record as-builts. Tectonic also performed vibration monitoring and geologic mapping associated with the excavation of a major rock slope to accommodate the highway realignment.

Special Inspection Feedback Form

Special Inspection Feedback Form

Section

1 = Not reliable and 10 = Very reliable
1 = Not well and 10 = Extremely well
1 = Not Satisfied and 10 = Extremely Satisfied
1 = Not satisfied and 10 = Very satisfied

Section

1 = Not Satisfied and 10 = Very Satisfied
1 = Not Satisfied and 10 = Very Satisfied
1 = Not Satisfied and 10 = Very Satisfied
1 = Not Satisfied and 10 = Very Satisfied

Section

(Please fill only if you answered "Yes" in the previous question)
Sending

Service Evaluation

Service Evaluation

Section

Your name
The company you're working with
A contact phone number if you would like to be contacted (In this format XXX-XXX-XXXX)
Feel free to express your views of TECTONIC service.
Sending

Enter your search criteria below: