Under this assignment (MTA C&D’s Consultant Construction Management Contract 1633, Task Order #6), Tectonic is providing Program Management, Design Compliance, and Construction Compliance services for the following design-bid-build construction contracts, which are all focused on achieving state of good repair at both above-ground and below-ground stations on three separate subway lines on the MTA New York City Transit (NYCT) system:
Package A: Station Rehabilitation at 3 locations on the Jamaica Line (A-35305): Consists of three Stations: 75th St, 85th St and Cypress Hills, under construction contract A-35305. The scope for this package includes rehabilitation or replacement of various structural and architectural elements as a part of station renewal to achieve a State of Good Repair (SOGR). Major elements of the project include, but are not limited to the following:
Package B: Station Rehabilitation at 5 Locations on Broadway/7th Avenue Line (A-37217): Consists of five Stations: 191st St, 145th St, 86th St, 79th St & 50th St under contract A-37217. The scope for this package includes various component repairs to achieve SOGR. Major elements of the project include, but are not limited to the following:
Package C: Platform Component Repairs at 2 Locations on the Queens Boulevard Line (A-36986): Consists of two Stations 36th & 46th St under contract A-36986. The scope for this package includes component repairs to achieve SOGR. Major elements of the project include, but are not limited to the following: