Under this assignment (MTA C&D’s Consultant Construction Management Contract 1633, Task Order #6), Tectonic is providing Program Management, Design Compliance, and Construction Compliance services for the following design-bid-build construction contracts, which are all focused on achieving state of good repair at both above-ground and below-ground stations on three separate subway lines on the MTA New York City Transit (NYCT) system:
Package A: Station Rehabilitation at 3 locations on the Jamaica Line (A-35305): Consists of three Stations: 75th St, 85th St and Cypress Hills, under construction contract A-35305. The scope for this package includes rehabilitation or replacement of various structural and architectural elements as a part of station renewal to achieve a State of Good Repair (SOGR). Major elements of the project include, but are not limited to the following:
Package B: Station Rehabilitation at 5 Locations on Broadway/7th Avenue Line (A-37217): Consists of five Stations: 191st St, 145th St, 86th St, 79th St & 50th St under contract A-37217. The scope for this package includes various component repairs to achieve SOGR. Major elements of the project include, but are not limited to the following:
Package C: Platform Component Repairs at 2 Locations on the Queens Boulevard Line (A-36986): Consists of two Stations 36th & 46th St under contract A-36986. The scope for this package includes component repairs to achieve SOGR. Major elements of the project include, but are not limited to the following:
The information helps Tectonic evaluate a vendor’s service capabilities, the volume of work the vendor can readily handle, insurance coverages, as well as health and safety information.
Prequalified vendors will have their purchase orders expedited and will be recommended for future work that falls within that firm’s service capabilities.