This 69,000-square-foot building is the first of a three-phase facility that will create the cornerstone of the sciences at Lehman. Designed to showcase the college’s strength in plant science teaching & research, Phase I includes laboratories for interdisciplinary teaching & research, science learning centers, offices, and a research facility.
Tectonic performed the following special inspection services in accordance with the Building Code of the City of New York that included the following: Soils- Site Preparation; Soils- Fill Placement & In-Place Density; Excavation- Sheeting, Shoring & Bracing; Structural Safety- Structural Stability; Underpinning; Concrete- Cast-In-Place steel reinforcement & concrete testing; Masonry; Structural Steel Welding, Erection & Bolting – Field & Shop; and Sprayed Fire-Resistant Materials among others.
Tectonic performed the following special inspection services in accordance with the Building Code of the City of New York that included the following: Soils- Site Preparation; Soils- Fill Placement & In-Place Density; Excavation- Sheeting, Shoring & Bracing; Structural Safety- Structural Stability; Underpinning; Concrete- Cast-In-Place steel reinforcement & concrete testing; Masonry; Structural Steel Welding, Erection & Bolting – Field & Shop; and Sprayed Fire-Resistant Materials among others.
Select a Prequalification form...
The information helps Tectonic evaluate a vendor’s service capabilities, the volume of work the vendor can readily handle, insurance coverages, as well as health and safety information.
Prequalified vendors will have their purchase orders expedited and will be recommended for future work that falls within that firm’s service capabilities.