Tectonic provided construction inspection and resident engineering services for the Lake Suzanne Dam Rehabilitation project in Ramapo, New York. The resident engineer managed field staff and contractor, inspected the work, completed all necessary NYSDOT MURK forms, and reviewed all contractor requisitions for approval. The scope of work for the contract consisted of removing and replacing the existing concrete spillway structure with a labyrinth spillway structure and raising the embankment elevations. After the existing concrete structure was removed and replaced, the embankment was reshaped, and stabilized with Heavy Stone Fill, grass, and wildflowers.
Select a Prequalification form...
The information helps Tectonic evaluate a vendor’s service capabilities, the volume of work the vendor can readily handle, insurance coverages, as well as health and safety information.
Prequalified vendors will have their purchase orders expedited and will be recommended for future work that falls within that firm’s service capabilities.