Kean University’s Demolition of Willis Hall Hazardous Materials Abatement and Demolition

Tectonic planned and managed the hazardous materials (HM) abatement and demolition of Kean University’s Willis Hall, a 50+ year old structure with known asbestos contamination. Services provided include the following:

Hazardous Materials Services
  • Hazardous materials (HM) survey with review of regulatory status under the New Jersey Department of Community Affairs (NJDCA) and Federal Rules.
  • Subsurface Geophysical Survey to confirm the locations of the buried utilities.
  • Soil testing for disposal purposes and analysis for the modal suite of disposal parameters, accompanied by a concise test report provided to the Contractor.
  • Permitting under the NJDCA, United States Environmental Protection Agency (USEPA), New Jersey Department of Labor and Workforce Development (NJDOL), and the City of Union.
  • Preparation of HM abatement plans and specifications, as prepared by a US EPA certified AHERA (Asbestos Hazard Emergency Response Act) asbestos Project Designer.
  • Hosting of pre-bid meeting; answering all RFIs; and recommending of the most qualified lowest contractor bidder.
  • Inspection and monitoring of the hazardous materials abatement by a certified licensed Asbestos Safety Control Monitor (ASCM) to ensure it is complaint and fully completed, and daily monitoring for fugitive emissions.
  • Interior air monitoring, sampling, and testing performed by NJDCA-certified Asbestos Safety Technicians (AST).
  • Real-time air monitoring performed at the perimeter of the work area, outside the building, utilizing Direct-Reading Instruments (DRI).
  • Close out of abatement by assembling all project documents, inspection and test results and other records into a project file sufficient to properly close the action under Federal and State program rules.
Demolition Services
  • Preparation of demolition specifications and plan drawings, including staging and sequencing plans, and waste management and safety plans, to guide the decontamination phase, and assistance with the competitive bidding of this phase of work and Kean’s selection process.
  • Permit guidance and assistance with the New Jersey Uniform Construction Code (NJUCC or UCC), per N.J.A.C. 5:23 et seq. and the City of Union; and Soil Erosion and Sediment Control (SESC) permitting under the applicable regional Soil Conservation District (SCD).
  • Testing of imported fill to verify product meets the definition of Clean Fill.
  • Inspection of all demolition work, tracking progress and shipments, plus monitoring for fugitive emissions daily and Perimeter Air Monitoring for fugitive silica dust.
  • Close out of demolition by assembling all project documents, inspection and test results and other records to properly close the action under Federal and State program rules.
Become a prequalified vendor

Become a prequalified vendor

INSTRUCTIONS

Companies interested in providing professional services or construction services to Tectonic must be prequalified. Firms that provide products or other services are not required to be prequalified.

  • Thank you for your interest in doing business with Tectonic:
  • Please answer all questions and provide all requested information. If a question is not applicable, indicate as “N/A” and provide an explanation if necessary.
  • Supplemental information sheets should be used to provide additional information that does not fit on the form.
  • Clearly indicate at the top of the supplemental information sheet which section of the questionnaire it references.
  • After the questionnaire is fully reviewed for completeness, please click on the “Submit” button.
  • Any questions regarding this form can be sent to prequal@tectonicengineering.com.

GENERAL

Maximum file size: 33.55MB

Upload a copy of your certificate(s) and/or screenshot(s) verifying the above reported status. * If you do not have any verifications, please be sure to check the box above for None or Not Applicable*

PRIMARY (CORPORATE) OFFICE INFORMATION

(Use this format: mm-dd-yyyy)

PRIMARY CONTACT

SECONDARY CONTACT

CLAIMS CONTACT

OFFICERS

.

STOCKHOLDERS

(include only those owning 5% of more of stock. Attach a supplemental sheet if needed.)

COLLECTIVE BARGAINING AGREEMENTS

(Identify union affiliations)
Do you have experience with projects that require Certified Payroll and Davis Bacon Wage Rates?

SERVICE CAPABILITIES

.

SERVICES PROVIDED

(Select all services that apply)

Maximum file size: 5MB

STAFFING

.

OFFICE LOCATIONS & REGIONS SERVED

(Including primary office)


LITIGATION / CONTRACT DISPUTES

List any judments, arbitrations, liens, insurance claims, or lawsuits the firm has been subject to within the past 5 years. If there are none, respond by saying there were none.

Maximum file size: 5MB

CRIMINAL BACKGROUND INFORMATION

Has the firm, any affiliate, or any of the current or former principal owners, stockholders, or officers or managerial employees:

Insurance Coverage

State your standard coverage limits in COLUMN 2 below.

POLICY

Occurrence (or claim) limit

Aggregate limit

GCL

Auto

Umbrella / Excess

Pollution / Liability

Workers Compensation

Professional Liability

Cyber / Network Security Liability


Health & Safety

Maximum file size: 33.55MB

Health & Safety (Cont.)

If Yes, does the training include:

Health & Safety (Cont.)

Health & Safety (Cont.)

Provide the following information for the last 3 years. You must respond to all questions even if your firm is not required to maintain OSHA logs.

  YEAR (most recent 3 years)

  Current Year

  Prior Year

  Prior Year

Worker's Compensation
Experience Modification Rate (EMR)


Number of Fatalities
(list any, explain in Supplemental Information field at the end of this form.)


Lost Work Day Incident Rate
(total lost-time recordable cases x 200,000 / total hours worked.)


OSHA Recordable Incident Rate
(total OSHA recordable cases x 200,000 / total hours worked)


Total Number of Hours Worked
(per occurrence)


The following upload fields allow for uploading of multiple files.
  1. To upload multiple files please click-and-hold the CTRL key and left-click with your mouse.
  2. Once you have selected the file(s) hit the "Open" button on the the dialog box.

Maximum file size: 10MB

Sending

Special Inspection Feedback Form

Special Inspection Feedback Form

Section

1 = Not reliable and 10 = Very reliable
1 = Not well and 10 = Extremely well
1 = Not Satisfied and 10 = Extremely Satisfied
1 = Not satisfied and 10 = Very satisfied

Section

1 = Not Satisfied and 10 = Very Satisfied
1 = Not Satisfied and 10 = Very Satisfied
1 = Not Satisfied and 10 = Very Satisfied
1 = Not Satisfied and 10 = Very Satisfied

Section

(Please fill only if you answered "Yes" in the previous question)
Sending

Service Evaluation

Service Evaluation

Section

Your name
The company you're working with
A contact phone number if you would like to be contacted (In this format XXX-XXX-XXXX)
Feel free to express your views of TECTONIC service.
Sending

Enter your search criteria below: