Sindall Brook Stabilization and Restoration

The eastern portion of the Town adjacent to Sindall Brook was experiencing flooding and property damage during significant rainfall events. Suspecting incremental effects of continued development of the upper reaches of the watershed, the Municipality retained Tectonic to review the stormwater management design approved for a project located in the watershed, but under the jurisdiction of an adjacent municipality. Tectonic performed a detailed study of the one square mile watershed including: field reconnaissance, homeowner meetings and outreach, hydrologic analysis and modeling using HEC-HMS, and hydraulic modeling (using HEC-RAS, HEC-HMS, manufacturers proprietary channel design software, or FHWA HY-8, depending on the location being analyzed) of six locations where mitigation of the stream banks was warranted to address erosive conditions. Final design phase services included preparation of plans, details, and specifications for the implementation of the stabilization by the Municipality.

Special Inspection Feedback Form

Special Inspection Feedback Form

Section

1 = Not reliable and 10 = Very reliable
1 = Not well and 10 = Extremely well
1 = Not Satisfied and 10 = Extremely Satisfied
1 = Not satisfied and 10 = Very satisfied

Section

1 = Not Satisfied and 10 = Very Satisfied
1 = Not Satisfied and 10 = Very Satisfied
1 = Not Satisfied and 10 = Very Satisfied
1 = Not Satisfied and 10 = Very Satisfied

Section

(Please fill only if you answered "Yes" in the previous question)
Sending

Service Evaluation

Service Evaluation

Section

Your name
The company you're working with
A contact phone number if you would like to be contacted (In this format XXX-XXX-XXXX)
Feel free to express your views of TECTONIC service.
Sending

Enter your search criteria below: