Fort Drum Guthrie Medical Center

Tectonic provided geotechnical engineering and site surveying services for this new 48,000 SF addition to a 1980’s, 89,000 SF, multi-story hospital and medical care clinic.

Geotechnical analysis was performed in accordance with U.S. Department of Defense Unified Facilities Criteria as well as site-specific Fort Drum Installation Design Guide documents for structural design. Tectonic performed a subsurface investigation including borings and test pits and prepared a geotechnical engineering report detailing the methods of investigation.

The $28 million addition supported an increase in the number of patients from about 36,000 to 43,000 soldiers, family members and retirees.

Special Inspection Feedback Form

Special Inspection Feedback Form

Section

1 = Not reliable and 10 = Very reliable
1 = Not well and 10 = Extremely well
1 = Not Satisfied and 10 = Extremely Satisfied
1 = Not satisfied and 10 = Very satisfied

Section

1 = Not Satisfied and 10 = Very Satisfied
1 = Not Satisfied and 10 = Very Satisfied
1 = Not Satisfied and 10 = Very Satisfied
1 = Not Satisfied and 10 = Very Satisfied

Section

(Please fill only if you answered "Yes" in the previous question)
Sending

Service Evaluation

Service Evaluation

Section

Your name
The company you're working with
A contact phone number if you would like to be contacted (In this format XXX-XXX-XXXX)
Feel free to express your views of TECTONIC service.
Sending

Enter your search criteria below: